Tel: +44 (0)161 241 0111 | Email: sales@connecttwo.org
Tel: +44 (0)161 241 0111 | Email: sales@connecttwo.org
Tel: +44 (0)161 241 0111
Email: sales@connecttwo.org
EBN School’s Manchester
The project involved the design and build of 6 No new 2 and 3 storey primary schools within the Manchester area.
Each of the Primary Schools being a modular building solution by Premier Modular.
A significant part of the Electrical Services Installation was carried out at the Premier Modular construction Facility in Brandesburton, Driffield, before being transported to the 6 No sites.
Along with Premier Modular, CTL delivered the 6 No School’s early and in time for the commencement of the school’s new term.
Within each of the school’s, CTL design a complete intelligent Wi-Fi lighting control system along with wireless lighting wall controls, whilst maintaining easy and functional operational control.



Tel: 0161 241 0111 | Email: sales@connecttwo.org
Telephone: 0161 241 0111
Email: sales@connecttwo.org

Our Clients

Our Services

Contact Us
Contact Details:
Unit 21, Chadkirk Business Park,
Romiley, Stockport, Cheshire SK6 3NE
Telephone: +44 (0)161 241 0111
Email: admin@connecttwo.org