Tel: +44 (0)161 241 0111 | Email: sales@connecttwo.org

Tel: +44 (0)161 241 0111 | Email: sales@connecttwo.org

Tel: +44 (0)161 241 0111
Email: sales@connecttwo.org

Affiliations Logos

EBN School’s Manchester

The project involved the design and build of 6 No new 2 and 3 storey primary schools within the Manchester area. 

Each of the Primary Schools being a modular building solution by Premier Modular. 

A significant part of the Electrical Services Installation was carried out at the Premier Modular construction Facility in Brandesburton, Driffield, before being transported to the 6 No sites. 

Along with Premier Modular, CTL delivered the 6 No School’s early and in time for the commencement of the school’s new term. 

Within each of the school’s, CTL design a complete intelligent Wi-Fi lighting control system along with wireless lighting wall controls, whilst maintaining easy and functional operational control. 

View our Corporate Profile
Affiliations Logos

Our Clients

Our Services

Contact Us

Contact Details:
Unit 21, Chadkirk Business Park,
Romiley, Stockport, Cheshire SK6 3NE
Telephone: +44  (0)161 241 0111
Email: admin@connecttwo.org

© ConnectTwo Ltd – 2019